The producers of FABTECH have launched a three-part webinar series that includes an expert line-up of visionary speakers sharing insights and predictions for the economic future covering the impact of the current state of affairs; pre and post-election insights and predictions for the future.
While FABTECH 2020 was cancelled due to the COVID-19 pandemic, plans are underway to bring FABTECH 2021 to Chicago in 2021. That means North America’s largest metal forming, fabricating, welding and finishing event will be heading to McCormick Place Sept. 13-16, 2021.
Infinite Material Solutions LLC announced the launch of a water-soluble 3D printing support material called AquaSys® 180.
Processed Metal Innovators LLC (PMI), Bloomer, Wis., is a metal fabricator that produces hundreds of different stamped and welded metal parts for heavy equipment, automobiles, appliances, and more.
In manufacturing, potentially flammable and hazardous chemicals such as acetone and isopropyl alcohol are often stored in 55-gallon or larger drums for dispensing into smaller containers or at the point of use.
Vibratory feeding and conveying equipment has been used in the manufacturing industry for several decades to move fine and coarse materials into mixers, furnaces, production processes or final containers.
Whether driven by the reduction of in-shop personnel due to layoffs or to maintain social distancing guidelines into the future, many machine shops will likely be re-evaluating ways to eliminate labor-intensive manual operations if they can be automated instead.
While recent advancements in machining centers have allowed for increased capability around high-volume operations, there are several factors that still necessitate the need for grinding.
Despite the challenges of COVID-19, research and expert analytics predict market growth in the near future for manufacturing in numerous industries, many of which rely on parts and components that require precision grinding.
Christoph Fedler, project director for equipment management at Rolls-Royce Germany, was facing a challenge: He needed to increase the available capacity of the prime discipline at the Oberursel facility, namely micrometer-precise grinding of curvic couplings.