Proper drill selection, the geometry built into the drills themselves, applying proper drilling parameters, and a few tips and tricks from the pros can address nagging drilling problems such as drill breakage, unbroken chips, tool runout, poor hole edges, and poor tool life.
With the Steel Topping Out event, ZEISS has completed the steel portion of its state-of-the-art site near Detroit. The new facility for the Industrial Quality and Research (IQR) segment of ZEISS, represented in the USA by Carl Zeiss Industrial Metrology, LLC, is scheduled to be complete in June 2020 and will consolidate four existing Michigan facilities into one location.