SME discussed with David Olson of Verisurf the growing importance of Model-Based Definition and the use of standard formats by small and medium sized manufacturers.
Sandvik AB has signed an agreement to acquire CGTech, Irvine, Calif., a global developer of software for numerical control (NC/CNC) simulation, verification and optimization.
BIG Kaiser Precision Tooling has promoted Jack Burley to President/Chief Operating Officer, effective January 1, 2021. Chris Kaiser, BIG Kaiser President and CEO for 30 years, will take on the role of Executive Advisor.
Engineering information is both pervasive and essential within manufacturing plants. And, it changes constantly as a result of maintenance-related adjustments, alterations in plant processes, or the swap-out of components.
The road to manufacturing success today runs through the mountain of data that tools are generating in metalcutting applications, and most importantly communicating and reacting to in real time on the shop floor.
While EDMs offer the benefits of holding tight tolerances, working on nearly any metal, and being well suited for delicate or fragile parts, knowledgeable operators for the machines are increasingly hard to find and robots can’t always fill the gap. Automated processes in the machines, newer designs and features of Industry 4.0 are helping to solve the problem.
Meeting the needs of the evolving digital manufacturing initiative, Open Mind Technologies (Needham, MA) has recently partnered with Heidenhain TNC controls (Schaumburg, IL) to provide exclusive first use of their new NC code-based machining simulation solution hyperMILL Virtual Machining.
The world of quality measurement devices and software continues to expand, and IMTS years are especially exciting times. If there is a theme in the many offerings—new devices, new software—it might be how quality devices are continuing to burrow their way into the heart of manufacturing on the shop floor.
Simulation tools are making it much easier for manufacturers to optimize their processes, visualizing the entire path of production from NC metalcutting simulations through 3D design and factory-floor imaging.
Unplanned downtime and production loss due to equipment failure is one of the leading losses for manufacturers. Most shops perform maintenance on a fixed schedule or on failure. This means a machine will be maintained regardless of how often it is used and unexpected breakdowns will stop production.