VeriTX Corp. announced today an agreement to license Moog Inc.’s VeriPart process which enables high integrity supply chain solutions.
The North American manufacturing Research Institution of SME (NAMRI | SME) held its 47th annual conference on manufacturing research (NAMRC 47) in Erie, Pa., from June 10-14.
LIFT – Lightweight Innovations For Tomorrow, announced today it received a $5 million grant to expand the program to nine additional military bases across the country over the next three years.
Siemens is planning the acquisition of Edge technology from the US
company Pixeom. With this action, Siemens is strengthening its Industrial
Edge portfolio by adding software components for Edge runtime and for
device management.
The term generative design has been popping up in the manufacturing world of late. Its promise is to create many design permutations to let engineers choose an optimum one that meets sometimes conflicting requirements.
Acquisition to Position PTC as CAD and PLM Industry Transitions to Software-as-a-Service (SaaS)
Manufacturers of all sizes see an uptick in productivity after adding a factory within a factory via an automated machining cell. The cells are small-scale, clearly defined production units, often for a family of similar parts or a product, and they typically include a robotic arm and one or more machine tools. These can include horizontal and vertical lathes, machining centers and grinders. The cell may also include a conveyor component.
On-time delivery (OTD), a measurement of the level of finish goods or services delivered when promised and in full, is a signal of efficiency that reveals how well operations is doing.
The technology behind the rise of cryptocurrencies is widely expected to bring ‘a common source of truth’ to manufacturing.
The human factor is sometimes just too cumbersome in manufacturing. Take the German chipmaker Infineon: By using an autonomous robot called Scout from MetraLabs for the last several years, the automotive supplier shrank to 10 from 300 the number of minutes it takes to collect the clean-room data needed to measure the presence of rare gases in the air.