Decathlon Improves Batch Processing for Glasses Made from AM

By Kevin Hsu Advanced Applications Engineer, 3D Systems

Decathlon, the world’s largest sporting goods retailer, is using the high-speed Figure 4 platform and new stacking feature of 3D Systems’ 3D Sprint software to enable direct production of 3D printed end-use parts. The stacking feature enables batch production of one or multiple parts through a combination of user-defined and automated tools, and removes significant time from the print preparation process.

glasses_768x432.jpg
Decathlon used Figure 4 to solve an injection mold problem for a small component for shooting glasses that connects the frame to the lenses.

The Challenge: Validate Efficient AM Production

When faced with a mold injection problem on a small component for shooting glasses that connects the frame to the lenses, Decathlon opted to test the new 3D stacking solution developed by 3D Systems to evaluate additive manufacturing for production. After conducting a feasibility study on the Figure 4 solution and stacking feature, Decathlon’s teams confirmed the productivity and economics of additive manufacturing and decided that this solution could be considered for batch-run production of the final product.

Part Stacking Feature in 3D Sprint Software

Decathlon’s additive manufacturing lab (ADDLAB) uses 3D Systems’ Figure 4 3D printing solution across a range of applications (including mold master patterns), and is now considering using the new high-density part stacking capability of 3D Systems’ 3D Sprint software to facilitate direct production. 3D Sprint is an advanced, all-in-one software that streamlines the file-to-pattern workflow with tools for print file preparation and optimization, including automatic support generation, and optimized part placement to maximize productivity. The new stacking feature helps users print high-volume batches with an efficient file preparation workflow.

cs-decathlon-production-printing-build-plate.jpg
Figure 4 solution with 3D Sprint stacking feature enables batch-run production.

To use the stacking feature, users import a part and base file, define the stack in terms of orientation and part quantities, and use automated tools to replicate consecutive vertical stack layers and supports. According to Decathlon engineer Gregoire Mercusot, stacking has reduced print preparation time by as much as 80 percent. Builds that used to take 30 minutes to an hour to prepare can now be completed in six to 10 minutes.

Mercusot says the utility of this function goes well beyond production: “I use this feature several times a week, whenever I need multiple parts. It’s incredible for production but it’s also very useful for prototyping,” he says.

Production-Grade Materials

Decathlon is using the Figure 4 PRO-BLK 10 material for this functional eyeglass component, citing the material’s strong rigid properties and fast print speeds (62 mm/hr) as key benefits. This high-precision material produces parts with smooth surface finish and sidewall quality, and has excellent long-term mechanical properties and environmental stability, bringing a new level of assurance to 3D production. From its production feasibility study, Decathlon confirmed reproducibility across print batches and full functionality of the part.

Print Speed

Figure 4 is a projection-based additive technology that uses a non-contact membrane to combine accuracy and detail fidelity with fast print speeds. Decathlon uses the Figure 4 Modular system to print stacks of 100 parts in 85 minutes, which is equivalent to 42 seconds per part. The Figure 4 Modular is a scalable, semi-automated 3D production solution comprised of a central controller that can be paired with a single printer-module or up to 24 printer modules, making it a flexible option that poises businesses for growth.

cs-decathlon-production-printing-single-part-in-focus.jpg
The stacking capability of Figure 4 brings efficiencies of scale to post-processing as well as part building.

Post-Processing

The high-density stacking capability of Figure 4 brings efficiencies of scale to post-processing as well as part building, allowing Decathlon to treat a batch of parts the same as a single part. This means that the time it would take for Decathlon to clean, cure, and remove the supports from a single part remains the same, even for a batch of 100 parts. For Decathlon’s shooting glasses application, it takes six minutes to clean all 100 parts, 90 minutes of hands-free time to cure them, and ten minutes to remove supports from the entire batch.