The digital universe is doubling in size every two years, projected to grow from 4.4 trillion gigabytes in 2013 to 44 trillion in 2020. Enterprises have responsibility for around 85 percent of the data held in this digital universe, according to the EMC Digital Universe.

plant-downtime_768x432.jpg
Plant downtime, including machine failure, can cost manufacturers up to $260,000 per hour, according to analyst firm Aberdeen Research.

Manufacturing plants are just one type of enterprise contributing to this data production, collecting process data to monitor machinery status. Plant engineers can make the most of this data and ensure their maintenance schedule benefits their plant, according to Claudia Jarret, U.S. manager at automation parts supplier EU Automation.

Manufacturers, faced with the constant pressure to keep up with customer demand while remaining flexible, are acutely aware of the threat of plant downtime, Jarret explained. Caused by a multitude of factors, including machine failure, downtime can cost manufacturers up to $260,000 per hour, according to analyst firm Aberdeen Research.

Therefore, preventive maintenance, where equipment is maintained before it breaks, is essential, rather than reactive maintenance, which focuses on fixing equipment following a breakdown.

But for those in high-volume, low-margin industries such as food and beverage or automotive parts manufacturing, preventive maintenance may be wrongly seen as unattainable, due to perceived high upfront costs. 

Prevention

The days of waiting for a system to fail due to overheating motors or leaking heat transfer systems, for example, are thankfully behind us, Jarret said. Plant managers now plan regular inspections, upgrades and troubleshooting to avoid breakdowns. These simple steps are one way in which preventive maintenance can be carried out.

EUA299-Image-two.jpg
With parts suppliers able to ship replacements worldwide within 24 hours, there is no need to store parts on site or suffer extended periods of downtime waiting for them to arrive.

But as Industry 4.0 technologies such as condition monitoring become more accessible, there are even smarter, more accurate and less time-consuming methods available.

Many manufacturing plants now use predictive maintenance, a sophisticated form of preventive maintenance, to establish how well equipment is functioning and accurately predict failures before they occur. Not only does this reduce the risk of downtime-causing breakdowns, but it can also mean any necessary replacement parts can be ordered and are in stock in case of equipment failures.

In addition, monitoring the health of equipment can allow for gradual tweaks, where a huge overhaul would previously have been required for improvements. Alterations can improve the efficiency of processes, ultimately reducing costs by eliminating inefficient elements and increasing equipment lifespan through maintenance or replacement of wearing parts.

Where to start

The first step a plant manager should take when implementing any preventive maintenance schedule is to gather as much data as possible, Jarret advised. This should include an accurate estimate of the real cost of downtime to the plant in question. Collating data collected by smart sensors, sales figures and retrofitted systems should allow you to take into account loss of sales, wasted product and the cost of emergency repairs, which can provide a useful baseline figure. 

Using their experience of the plant, maintenance engineers should also be involved to produce an ideal plan for the plant, including areas they believe will require higher levels of maintenance, such as older equipment or machinery that is inherently prone to breakdowns such as motors, turbines, or other moving parts.

This plan can then be used alongside the budget to produce a realistic maintenance plan, including what level of preventive maintenance can be employed. For some manufacturers, this will mean regular equipment checks, such as once a month for a section of plant, or daily for more volatile machinery.

Data

If true predictive maintenance is the goal, data such as temperature, pressure and vibration is collected by sensors and will be continually integrated, stored and analyzed. The next question for manufacturers is how to make the most of these valuable, but large, data sets.

EUA299-Image-one.jpg
Manufacturers must decide how to make the most of all the valuable, but large, data sets acquired from smart sensors on their machines.

Once the data has been collected, the next step to make the most of its potential is to begin analysis. One popular option for data analysis is a cloud analytics service. Here, raw data is transmitted to the cloud, where it can both be stored and analyzed for trends that can predict an event including a breakdown. Many services also incorporate an alert system and warnings of impending breakdowns can be sent via a web portal, app, e-mail, or text message to relevant personnel.

Other manufacturers, perhaps concerned about cybersecurity, the long-term stability of data stored in the cloud, or lag between data collection and analysis, will analyze raw data in-house. Although this is often significantly more resource-heavy, it gives plant managers complete control over their data.

Obsolescence

Regardless of which system is implemented, predictive maintenance can be used to manage obsolescence, in addition to reducing downtime and improving process efficiency.

This means parts can be ordered at the correct time to suit the maintenance schedule. Traditionally, manufacturers would have to keep a stock of parts that may need replacing, which take up valuable space on the plant floor that could instead be used for operations. Spare parts can also be bulky and produce a health and safety hazard, including trip or fire hazards, if stored on the plant floor.

Instead, manufacturers can choose to order in replacement parts only when necessary, maximizing the space and resources they have available to them. With suppliers such as EU Automation able to ship obsolescent parts worldwide within 24 hours, there is now no need to store parts on site or suffer extended periods of downtime waiting for them to arrive. 

When predictive maintenance is employed, data collected can also be used for other purposes, such as increasing process efficiency and ensuring replacement parts are ordered in plenty of time. Proper collection and analysis of this data is essential to maximize its potential—and this will only become more important each year as the quantity of data increases.